News

A breakthrough was achieved on Thursday as a boring machine deployed for Mumbai Metro Line-7A dug a 1.647 km long underground ...
Chief Minister Fadnavis witnesses Mumbai Metro Line 7A tunnel breakthrough, connecting Andheri East to Chhatrapati Shivaji ...
In a significant milestone for city’s expanding metro network, the TBM ‘Disha’ working on the Mumbai Metro Line 7A corridor ...
In a significant milestone for city’s expanding metro network, the Tunnel Boring Machine (TBM) ‘Disha’ working on the Mumbai Metro Line 7A corridor achieved a breakthrough today, completing a key ...
Trials will help in evaluating the performance of systems like tracks, signalling and train operation prior to start of ...
When completed, the 24.9 km line will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully ...
The Mumbai Metropolitan Region Development Authority (MMRDA) has signed non-binding lines of credit worth Rs 4.07 lakh crore ...
REC and MMRDA have inked a deal for Rs 1 lakh crore to finance various infrastructure projects in Mumbai. This collaboration ...
The allocated Plot C-82 in G Block, BKC, has a total area of 5,500 square metres and a built-up area of 22,000 square metres, ...
Mumbai: Construction of the grand memorial of Dr Babasaheb Ambedkar at Indu Mill in Dadar has gathered momentum with several key components nearing co.
Mumbai: The Mumbai Metropolitan Region Development Authority (MMRDA) allotted a 3,400sqm plot in Bandra-Kurla Complex (BKC) ...